Stages of construction

1. Initial state

2. Placement and joining of root protection layer

3. Placement of protection layer VLU-300 and drainage board Diadrain-25H

4. Placement of protection layer VLF 150

5. Backfilling of drainage board with gravel in the areas in which wooden decking will be placed.

6. Placement of wooden decking upon the Diaturtle height-adjustable pedestals.

7. Placement of KLS edging element along the perimeter of the wooden decking.

8. Lifting of special plant growth substrate SEM

9. Laying of special plant growth substrate SEM

10. Placement of drainage channel RNF-05 along the length of the wall and of retaining aluminium gravel board KLS.

11. Entrance terrace grid TRS

12. Inspection box KSΑ 15

13. Final appearance